Construction works at the Lanchester Building, Watford were completed in October 2014. The project transformed the former redundant West Herts College Building into a new two form entry primary school with nursery. The works comprised the construction of two new stairwells and the total refurbishment of the existing building.
Internal refurbishment works include the demolition of part of the second floor slab to create a new school hall, the complete installation of mechanical and electrical services, a school kitchen, new incoming services, replacement high performance windows, internal remodelling, refurbished and new toilet accommodation, replacement lift and complete redecoration and provision of fixed furniture and fittings.
Martindales provided project manager, lead designer and CDM C services for this project. Project Construction value is £3,500,000.
![]() | London | ![]() | 020 7680 4400 |
---|---|---|---|
Billericay | 01277 637800 | ||
Cambridge | 01223 202040 | ||
Colchester | 01206 224270 | ||
Norwich | 01603 666847 | ||
Oxford | 01865 411475 |
Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: 10-12 Alie Street, London, E1 8DE. VAT No. 262 7242 10 |