Ingleton Wood
We are hiring
Home
Jobs
    • About Us
      • Overview
      • Partners
      • Our Senior Team
      • Careers
      • Practice Management
      • Awards
      • Testimonials
    • Our Services
      • Architecture
      • Building Surveying
      • Building Services Engineering
      • Planning
      • Interior Design
      • Sustainability
      • Civil and Structural Engineering
      • Quantity Surveying
      • Project Management
      • CDM and H&S Services
      • Building Information Modelling
    • Our Sectors
      • Commercial
      • Defence
      • Education
      • Fuel Filling Stations
      • Health
      • Heritage and Conservation
      • Leisure
      • Residential
      • Social and Community
    • Our Projects
    • News & Events
      • Latest News
      • Our Blog
    • Contact Us
      • London
      • Billericay
      • Cambridge
      • Colchester
      • Norwich
      • Oxford

< Back to Our Projects

Mayflower High School New Teaching Block

Mayflower High School New Teaching Block

Ingleton Wood were appointed by Mayflower High School in Billericay, a longstanding client of our Billericay office, to prepare a Condition Improvement Fund (CIF) bid. The bid was for replacement of four dilapidated demountable buildings with a new purpose built six classroom teaching block.

Ingleton Wood developed an initial design and obtained planning approval for the scheme. An ‘Employer’s Requirements’ document for a modular construction was prepared and this, together with the design, were submitted for tender. This information coupled with a statement of need, formed the basis of the CIF bid which was successful securing the funding for the project.

Once the contractor was appointed, the works were completed within 6 months, on programme and delivered within budget.

The resultant classroom block is fully compliant with the Building Bulletin’s and all statutory legislation, performing to a high standard of thermal and acoustic performance.

The new block boasts office space, WC’s and lift, together with a VRF heating and cooling system, all of which are incorporated within the design and scope of the finished building.

Related Links

Our Services

Building SurveyingProject WorkBuilding Services EngineeringMechanical DesignElectrical DesignPlanningPlanning Applications and AppealsProject ManagementCDM and H&S Services

Our Sectors

Education

Our Senior Team

Chris Mabbutt

Offices

Billericay

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: 10-12 Alie Street, London, E1 8DE. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please choose whether to approve, customise or reject the site's use of cookies; your choice will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.

You can view our cookie policy at the following page: Cookies Policy.