Martindales have completed two projects at Sir Harry Smith Community College since 2007.The first was a Resource Centre which provided a large multi-use space suitable for quiet study, teaching or large assemblies.
In 2009 we completed our second project at the school; a new Sixth Form Centre.
The new building was constructed as a self-sufficient unit with its own boiler room, entrance and toilets. As a result it can be used by community groups outside school hours and independent from the operation of the school. The main space in the building can be configured in a number of different ways to suit a wide variety of user groups.
![]() | London | ![]() | 020 7680 4400 |
---|---|---|---|
Billericay | 01277 637800 | ||
Cambridge | 01223 202040 | ||
Colchester | 01206 224270 | ||
Norwich | 01603 666847 | ||
Oxford | 01865 411475 |
Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: 10-12 Alie Street, London, E1 8DE. VAT No. 262 7242 10 |