The Construction (Design and Management) Regulations 2015 (CDM) looked to build on the successes of the previous version by introducing a new Duty Holder called the Principal Designer. This position replaced, albeit not directly, the former role of the CDM Coordinator.
The Principal Designer is the organisation appointed by the CDM Client for a project to control and manage the pre-construction or design phase of a construction project. It is one of the five Duty Holder positions identified by the CDM Regulations as required when a project is reasonably foreseen to involve more than one on site contractor.
The pre-construction phase is defined in the CDM Regulations as “any period of time during which design or preparatory work is carried out for a project and may continue during the construction phase”.
It is important to note that the appointment of the Principal Designer by the Client must be done in writing and cannot be presumed. If the Client fails to make the appointment, they themselves will be considered Principal Designer for the purposes of the Regulations.
All Designers involved on a project have a duty to ensure the Client is aware of their duties under the Regulations and as such must advise the Client that a Principal Designer needs to be formally appointed.
Principal Designers perform an important role within a construction project team, they are able to influence and control how risks to Health and Safety are managed and monitored during a project. Design decisions made during the early phases of a project can impact on the delivery of a project by ensuring high standards of health, safety and welfare are maintained as well as assisting in reducing delays and lowering overall costs of the project.
For further information relating to the role of the Principal Designer please contact us.
What is a Principal Designer?Our CDM ServiceClient and Contractors CDM CPDThe Building Safety ActHas the Building Safety Bill become law?What is the Building Safety Act?Does the Building Safety Act apply to all buildings?What are the key changes to the Building Safety Act?Changes to the Building RegulationsWhat does the Building Regulations Client have to do?Who is the Accountable Person?How do I prepare for Building Safety Act changes?
London | 020 7680 4400 | ||
Billericay | 01277 637800 | ||
Cambridge | 01223 202040 | ||
Colchester | 01206 224270 | ||
Norwich | 01603 666847 | ||
Nottingham | 0115 8654072 | ||
Oxford | 01865 411475 |
Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: The Loom, 14 Gower’s Walk, London, E1 8PY. VAT No. 262 7242 10 |