Ingleton Wood
Our BrochuresContact UsWe are hiring
  • our practice
    • About us
    • Our Mission and Values
    • Our Story
    • Practice Management
    • Our sustainability commitment
    • Frameworks
    • The Armed Forces Covenant
    • Awards
    • Testimonials
    • Brochures
  • Our People
    • overview
    • Equality, Diversity and Inclusion
    • Life at Ingleton Wood
    • Careers
    • Apprenticeships
    • Supporting CPD
    • Benefits
    • How to join our practice
    • Our Partnership
      • John Dixon
      • Stuart Norgett
      • David Cresswell
      • Laura Mansel-Thomas
      • Paul Cavalier
      • Simon Gorst
      • Daniel Legg
      • Anni Folan-White
      • Darren Fowler
      • Peter Webb
    • Our Senior Team
  • our services
    • Architecture
      • Concept and Feasibility
      • Masterplanning
      • Planning Applications
      • Detailed Design
      • Visualisation
    • Building Surveying
      • Drone Services
      • Project Work
      • Expert Witness
      • Surveys
      • Dilapidations
      • Repairs and Maintenance
      • Technical Due Diligence (TDD)
      • Party Wall and Neighbourly Matters
      • Reinstatement Cost Assessments
      • Development Monitoring
      • Cladding
    • Building Services Engineering
      • Mechanical Design
      • Electrical Design
      • Environmental Design
      • Surveys and Asset Registers
      • Management Services
      • Defence and Security
    • Planning
      • Planning Applications and Appeals
      • Planning and Development Appraisals
      • Development Plan Representations
      • Masterplanning
      • Public Consultation
      • Post Planning Services
    • Interior Design
      • Our Service
      • Our Expertise and Adding Value
      • Visualisation
    • Sustainability
      • Climate resilience
      • Sustainability in Planning
      • Regulation Compliance
      • Energy Strategies
      • Passivhaus
      • BREEAM and Code
      • Zero Carbon
      • Post Occupancy Evaluation
      • CPD and Research
      • Health and wellbeing
      • WELL certification
    • Civil Engineering
      • Planning Services
      • Flood Risk Assessment
      • Drainage Design
      • Sustainable Drainage
      • Highways
      • Enabling Works
      • External Works
    • Structural Engineering
      • Structural Design
      • Foundation Design
      • Basement and Retaining Wall Design
      • Timber Metal Frame Design
      • Structural Inspections
    • Quantity Surveying
    • Project Management
    • CDM and H&S Services
      • What is a CDM Advisor?
      • What is a Principal Designer?
      • Our CDM Service
      • What does a Client have to do?
      • Are you a Duty Holder?
      • Client and Contractors CDM CPD
      • H&S Services
    • The Building Safety Act
      • What is the Building Safety Act?
      • Does the Building Safety Act apply to all buildings?
      • What are the key changes to the Building Safety Act?
      • Changes to the Building Regulations
      • What does the Building Regulations Client have to do?
      • Who is the Accountable Person?
      • How do I prepare for Building Safety Act changes?
    • transport and infrastructure
      • Feasibility and Viability
      • Highway and Access Design
      • Travel Plans
      • Transport planning
  • our sectors
    • Arts and Culture
    • Bluelight
    • Commercial
      • Offices
      • Industrial
      • Retail
      • Telecoms
    • Defence
    • Education
      • Education Services
    • EV Hub Design Services
    • Fuel Filling Stations
    • Health
    • Heritage and Conservation
    • Laboratories
    • Leisure
    • Residential
    • Social and Community
  • our projects
  • news & socials

Ingleton Wood appointed for ‘game-changing’ UK build of ultra-fast electric vehicle charger network by The EV Network Friday, 20th August 2021

Ingleton Wood has been selected by The EV Network, a leading electric vehicle (EV) charging infrastructure company, on a major rollout of “game-changing” ultra-fast charging stations on key road networks and locations across the UK.

Our partnership with The EV Network (EVN) aims to deliver over 100 ultra-fast charging stations with additional schemes in the next few years to increase the availability of EV charging before the sale of new petrol and diesel cars is banned by 2030.

All schemes will be committed to an ambitious net-zero strategy using renewable materials and supply chains during construction. Each site will use renewable electricity from the National Grid in addition to solar panels built into the roof and energy storage systems.

Under new ultra-fast technology, a 15-minute visit using 300kW chargers can charge a typical vehicle back up to around 80% from a low amount of 10-20% approximately.

A planning application for the first EVN charging site has been submitted for a location at Cransley Park in Kettering, Northamptonshire.

The development is at a strategic location on the A14 and will contain ultra-fast charging for 24 vehicles with a solar canopy and battery storage. The forecourt features a café and rest area for drivers as they charge, as well as toilet and other facilities.

We are providing multi-disciplinary services including planning, architectural and project management.

Partner Anni Folan-White said: “We are delighted to be working with The EV Network on this exciting and futuristic project to revolutionise EV charging across the UK – starting with this fantastic proposal in Northamptonshire.

“We have extensive experience in designing and managing complex infrastructure projects and we’ve worked tirelessly and meticulously across our multi-disciplinary teams to make the initial concept a reality.

“We look forward to advancing this project and achieving our net-zero ambitions at such a pivotal moment following the latest stark warnings on global climate change from the UN’s intergovernmental panel on climate change (IPCC).”

The EV charging stations will range from a simple charging hub with 12 ultra-fast charging points, to a larger forecourt similar to the Kettering site with 24 ultra-fast charging bays.

Concerns over charging infrastructure were identified as the biggest barrier for UK motorists switching to EVs, a recent Department for Transport (DfT) survey found. Almost four in 10 (38%) cited worries over where and how to recharge, while another 38% had concerns over battery life/distance travelled. Three in 10 (30%) mentioned a scarcity of charging points.

Reza Shaybani, Co-Founder and CEO of The EV Network, said: “We are thrilled to be working with Ingleton Wood to outline our vision and take the first step towards building our game-changing ultra-fast EV charging stations.

“We are fiercely committed to delivering our ambitious net-zero strategy for all our schemes, from the construction process through to the green energy supplier we select for each site.

“We have spent the last few years working together with Ingleton Wood to develop a concept that can be implemented easily at a range of sites across the UK to ensure we are able to deliver the net-zero infrastructure required to drive the nation’s ultra-fast EV revolution.”

To learn more about The EV Network (EVN) and its UK rollout, visit www.theevnetwork.com

EV Network image

XPinterestLinkedInEmailShare with other services

Related Links

Tags

#electricvehiclechargernetwork#partnership#evnetwork#netzerostrategy#renewableelectricity#sustainability#professionalservices

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Nottingham0115 8654072
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Email Health and Safety
  • Email Sustainability
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2025 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: The Loom, 14 Gower’s Walk, London, E1 8PY. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer