Ingleton Wood
Our BrochuresContact UsWe are hiring
  • our practice
    • About us
    • Our Mission and Values
    • Our Story
    • Practice Management
    • Our sustainability commitment
    • Frameworks
    • The Armed Forces Covenant
    • Awards
    • Testimonials
    • Brochures
  • Our People
    • overview
    • Equality, Diversity and Inclusion
    • Life at Ingleton Wood
    • Careers
    • Apprenticeships
    • Supporting CPD
    • Benefits
    • How to join our practice
    • Our Partnership
      • John Dixon
      • Stuart Norgett
      • David Cresswell
      • Laura Mansel-Thomas
      • Paul Cavalier
      • Simon Gorst
      • Daniel Legg
      • Darren Fowler
      • Peter Webb
      • Max Chapman
      • Wesley Henderson
    • Our Senior Team
  • our services
    • Architecture
      • Concept and Feasibility
      • Masterplanning
      • Planning Applications
      • Detailed Design
      • Visualisation
    • Building Surveying
      • Drone Services
      • Project Work
      • Expert Witness
      • Surveys
      • Dilapidations
      • Repairs and Maintenance
      • Technical Due Diligence (TDD)
      • Party Wall and Neighbourly Matters
      • Reinstatement Cost Assessments
      • Development Monitoring
      • Cladding
    • Building Services Engineering
      • Mechanical Design
      • Electrical Design
      • Environmental Design
      • Surveys and Asset Registers
      • Management Services
      • Defence and Security
    • Planning
      • Planning Applications and Appeals
      • Planning and Development Appraisals
      • Development Plan Representations
      • Masterplanning
      • Public Consultation
      • Post Planning Services
    • Interior Design
      • Our Service
      • Our Expertise and Adding Value
      • Visualisation
    • Sustainability
      • Climate resilience
      • Sustainability in Planning
      • Regulation Compliance
      • Energy Strategies
      • Passivhaus
      • BREEAM and Code
      • Zero Carbon
      • Post Occupancy Evaluation
      • CPD and Research
      • Health and wellbeing
      • WELL certification
    • Civil Engineering
      • Planning Services
      • Flood Risk Assessment
      • Drainage Design
      • Sustainable Drainage
      • Highways
      • Enabling Works
      • External Works
    • Structural Engineering
      • Structural Design
      • Foundation Design
      • Basement and Retaining Wall Design
      • Timber Metal Frame Design
      • Structural Inspections
    • Quantity Surveying
    • Project Management
    • CDM and H&S Services
      • What is a CDM Advisor?
      • What is a Principal Designer?
      • Our CDM Service
      • What does a Client have to do?
      • Are you a Duty Holder?
      • Client and Contractors CDM CPD
      • H&S Services
    • The Building Safety Act
      • What is the Building Safety Act?
      • Does the Building Safety Act apply to all buildings?
      • What are the key changes to the Building Safety Act?
      • Changes to the Building Regulations
      • What does the Building Regulations Client have to do?
      • Who is the Accountable Person?
      • How do I prepare for Building Safety Act changes?
    • transport and infrastructure
      • Feasibility and Viability
      • Highway and Access Design
      • Travel Plans
      • Transport planning
  • our sectors
    • Arts and Culture
    • Bluelight
    • Commercial
      • Offices
      • Industrial
      • Retail
      • Telecoms
    • Defence
    • Education
      • Education Services
    • EV Hub Design Services
    • Fuel Filling Stations
    • Health
    • Heritage and Conservation
    • Laboratories
    • Leisure
    • Residential
    • Social and Community
  • our projects
  • news & socials

Businesses urged to book ESOS assessments to avoid fines of up to £90,000 Tuesday, 14th March 2023

Our sustainability experts are urging businesses to get ahead of the rush and book mandatory Energy Savings Opportunity Scheme (ESOS) assessments as soon as possible to avoid fines of up to £90,000.

Any large, non-SME (small and medium-sized enterprise) company is legally required to conduct a thorough energy audit of their entire operations and submit the report, signed by an accredited ESOS lead assessor, to the Environment Agency by 5 December 2023. 

But as assessors get fully booked up close to crunch time, we encourage businesses to complete their assessments early this year or risk facing hefty non-compliance fines.

Shawn Galliers, Director of Sustainability and qualified ESOS lead assessor said: “Although we’re only midway through March, the ESOS submission deadline of 5 December is approaching fast. Every year we see businesses failing to book assessments early and then scrambling to find a lead assessor in November. The full ESOS process can take months, so we recommend getting ahead of the curve and submitting your report as soon as possible.

“The first step is identifying if your organisation qualifies for ESOS. Any UK company with more than 250 employees or an annual turnover above £44M and an annual balance sheet over £38M must comply. But if your company is part of a corporate structure of which any other business qualifies, your company also qualifies. For instance, if you have a subsidiary company with over 250 employees then you too must complete an ESOS assessment – even if that subsidiary is based outside the UK.”

First introduced in 2014, ESOS is part of the Government’s push to ensure the UK reaches its goal of net zero emissions by 2050. The scheme is now in Phase 3, with report submissions due every four years. 20 UK companies were fined for non-compliance during ESOS Phase 2. Fines can be up to £50,000 plus £500 for each working day an organisation remains in violation, with a maximum of 80 days.

Qualifying organisations must submit their total energy consumption for the year, including owned transport and grey fleet, and identify opportunities for improvement. The reports are legally required to be signed off by both a qualified ESOS lead assessor and the company director(s).

Companies are not required to implement the energy saving opportunities identified through ESOS assessments. However, many UK companies can save thousands annually just by making simple changes such as switching to high efficiency LED lighting.

Here at Ingleton Wood, we offer a full Phase 3 ESOS assessment with qualified ESOS Assessors and in-house M&E teams, including liaison with the Environment Agency, full surveys, reports and meetings to explain the findings. We also provide clients with a road map to any net zero targets they have adopted, including insights into long-term carbon reduction and sustainability.

For more information about our sustainability services, visit https://www.ingletonwood.co.uk/sustainability.php 

For more information about ESOS, visit https://www.gov.uk/guidance/energy-savings-opportunity-scheme-esos 

XPinterestLinkedInEmailShare with other services

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Nottingham0115 8654072
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Email Health and Safety
  • Email Sustainability
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2025 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: The Loom, 14 Gower’s Walk, London, E1 8PY. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please choose whether to approve, customise or reject the site's use of cookies; your choice will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.

You can view our cookie policy at the following page: Cookies Policy.