Ingleton Wood
Our BrochuresContact UsWe are hiring
  • our practice
    • About us
    • Our Mission and Values
    • Our Story
    • Practice Management
    • Our sustainability commitment
    • Frameworks
    • The Armed Forces Covenant
    • Awards
    • Testimonials
    • Brochures
  • Our People
    • overview
    • Equality, Diversity and Inclusion
    • Life at Ingleton Wood
    • Careers
    • Apprenticeships
    • Supporting CPD
    • Benefits
    • How to join our practice
    • Our Partnership
      • John Dixon
      • Stuart Norgett
      • David Cresswell
      • Laura Mansel-Thomas
      • Paul Cavalier
      • Simon Gorst
      • Daniel Legg
      • Darren Fowler
      • Peter Webb
      • Max Chapman
      • Wesley Henderson
    • Our Senior Team
  • our services
    • Architecture
      • Concept and Feasibility
      • Masterplanning
      • Planning Applications
      • Detailed Design
      • Visualisation
    • Building Surveying
      • Drone Services
      • Project Work
      • Expert Witness
      • Surveys
      • Dilapidations
      • Repairs and Maintenance
      • Technical Due Diligence (TDD)
      • Party Wall and Neighbourly Matters
      • Reinstatement Cost Assessments
      • Development Monitoring
      • Cladding
    • Building Services Engineering
      • Mechanical Design
      • Electrical Design
      • Environmental Design
      • Surveys and Asset Registers
      • Management Services
      • Defence and Security
    • Planning
      • Planning Applications and Appeals
      • Planning and Development Appraisals
      • Development Plan Representations
      • Masterplanning
      • Public Consultation
      • Post Planning Services
    • Interior Design
      • Our Service
      • Our Expertise and Adding Value
      • Visualisation
    • Sustainability
      • Climate resilience
      • Sustainability in Planning
      • Regulation Compliance
      • Energy Strategies
      • Passivhaus
      • BREEAM and Code
      • Zero Carbon
      • Post Occupancy Evaluation
      • CPD and Research
      • Health and wellbeing
      • WELL certification
    • Civil Engineering
      • Planning Services
      • Flood Risk Assessment
      • Drainage Design
      • Sustainable Drainage
      • Highways
      • Enabling Works
      • External Works
    • Structural Engineering
      • Structural Design
      • Foundation Design
      • Basement and Retaining Wall Design
      • Timber Metal Frame Design
      • Structural Inspections
    • Quantity Surveying
    • Project Management
    • CDM and H&S Services
      • What is a CDM Advisor?
      • What is a Principal Designer?
      • Our CDM Service
      • What does a Client have to do?
      • Are you a Duty Holder?
      • Client and Contractors CDM CPD
      • H&S Services
    • The Building Safety Act
      • What is the Building Safety Act?
      • Does the Building Safety Act apply to all buildings?
      • What are the key changes to the Building Safety Act?
      • Changes to the Building Regulations
      • What does the Building Regulations Client have to do?
      • Who is the Accountable Person?
      • How do I prepare for Building Safety Act changes?
    • transport and infrastructure
      • Feasibility and Viability
      • Highway and Access Design
      • Travel Plans
      • Transport planning
  • our sectors
    • Arts and Culture
    • Bluelight
    • Commercial
      • Offices
      • Industrial
      • Retail
      • Telecoms
    • Defence
    • Education
      • Education Services
    • EV Hub Design Services
    • Fuel Filling Stations
    • Health
    • Heritage and Conservation
    • Laboratories
    • Leisure
    • Residential
    • Social and Community
  • our projects
  • news & socials

Ingleton Wood supporting Blenheim Palace Orangery £2 million conservation Friday, 26th May 2023

The iconic Blenheim Palace, based in Woodstock, Oxfordshire, is undergoing a £2 million conservation project to replace the original roof of its historic Orangery.

Ingleton Wood has been appointed to support the conservation by providing mechanical, electrical, and sustainability services at the Grade 1 Listed World Heritage Site.

The glass ceiling of the 18th century Orangery is being replaced with a timber and slate structure in the spirit of Sir John Vanbrugh’s original design. The project at the heritage site is aiming to help combat the effects of climate change and is expected to complete in autumn 2023.

Thomas McCosker, Senior Sustainability Specialist based at our Oxford office, said: “The new energy-efficient roof at the beautiful Orangery Restaurant is an exciting and significant step forward in Blenheim Palace’s pledge to reach carbon neutrality by 2027.

“Using our expertise across the heritage sector and multi-disciplinary sustainability services, we have already conducted a thermal modelling exercise to establish the energy and carbon saving opportunities before upgrading the electrics to ensure they will be suitable for the new environment.

"The new fully insulated roof is designed to reduce heat loss in the winter and prevent excessive sunlight from entering in the summer, helping to keep the restaurant at optimal temperatures all-year round while minimising any use of heating or cooling.

“We look forward to continue working closely with Blenheim Palace on this sustainable restoration that guests will enjoy for many years to come.”

The original glass roof was installed after a fire broke out in an adjacent bakery and damaged the roof structure in 1861.

Kelly Whitton, Head of Built Heritage at Blenheim Palace, said: “We are restoring the Orangery to what we understand to be its original form, based on research and pre-fire evidence remaining on site.

“The 19th century glass roof has come to the end of its life, and it is time to make a serious change. Due to the pressures of climate change and noticeable temperature swings, we are proposing to return the roof back to slate.

“Slate combined with modern insulation will be a far more effective insulator than glass, saving energy and helping Blenheim reach its green goals.”

The Orangery renovation project is being fully funded by Blenheim Palace visitors. 

“Every visitor has helped to make this conservation a reality and we want to thank them and let them know they are a part of Blenheim Palace’s history. Their admission goes directly towards preserving the legacy of the World Heritage Site,” said Kelly.

Ingleton Wood is being supported by Nick Cox Architects who is providing architectural services. Nick Cox, Principal Architect at Nick Cox Architects said: “We are delighted to be working with Ingleton Wood on the Blenheim Orangery project. It is a transformation to this important space and provision of new electrical services, data and lighting is an integral part of the project.”

Blenheim Palace Orangery conservation

Blenheim Palace Organery conservation

XPinterestLinkedInEmailShare with other services

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Nottingham0115 8654072
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Email Health and Safety
  • Email Sustainability
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2025 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: The Loom, 14 Gower’s Walk, London, E1 8PY. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please choose whether to approve, customise or reject the site's use of cookies; your choice will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.

You can view our cookie policy at the following page: Cookies Policy.