Ingleton Wood
Our BrochuresContact UsWe are hiring
  • our practice
    • About us
    • Our Mission and Values
    • Our Story
    • Practice Management
    • Our sustainability commitment
    • Frameworks
    • The Armed Forces Covenant
    • Awards
    • Testimonials
    • Brochures
  • Our People
    • overview
    • Equality, Diversity and Inclusion
    • Life at Ingleton Wood
    • Careers
    • Apprenticeships
    • Supporting CPD
    • Benefits
    • How to join our practice
    • Our Partnership
      • John Dixon
      • Stuart Norgett
      • David Cresswell
      • Laura Mansel-Thomas
      • Paul Cavalier
      • Simon Gorst
      • Daniel Legg
      • Darren Fowler
      • Peter Webb
      • Max Chapman
      • Wesley Henderson
    • Our Senior Team
  • our services
    • Architecture
      • Concept and Feasibility
      • Masterplanning
      • Planning Applications
      • Detailed Design
      • Visualisation
    • Building Surveying
      • Drone Services
      • Project Work
      • Expert Witness
      • Surveys
      • Dilapidations
      • Repairs and Maintenance
      • Technical Due Diligence (TDD)
      • Party Wall and Neighbourly Matters
      • Reinstatement Cost Assessments
      • Development Monitoring
      • Cladding
    • Building Services Engineering
      • Mechanical Design
      • Electrical Design
      • Environmental Design
      • Surveys and Asset Registers
      • Management Services
      • Defence and Security
    • Planning
      • Planning Applications and Appeals
      • Planning and Development Appraisals
      • Development Plan Representations
      • Masterplanning
      • Public Consultation
      • Post Planning Services
    • Interior Design
      • Our Service
      • Our Expertise and Adding Value
      • Visualisation
    • Sustainability
      • Climate resilience
      • Sustainability in Planning
      • Regulation Compliance
      • Energy Strategies
      • Passivhaus
      • BREEAM and Code
      • Zero Carbon
      • Post Occupancy Evaluation
      • CPD and Research
      • Health and wellbeing
      • WELL certification
    • Civil Engineering
      • Planning Services
      • Flood Risk Assessment
      • Drainage Design
      • Sustainable Drainage
      • Highways
      • Enabling Works
      • External Works
    • Structural Engineering
      • Structural Design
      • Foundation Design
      • Basement and Retaining Wall Design
      • Timber Metal Frame Design
      • Structural Inspections
    • Quantity Surveying
    • Project Management
    • CDM and H&S Services
      • What is a CDM Advisor?
      • What is a Principal Designer?
      • Our CDM Service
      • What does a Client have to do?
      • Are you a Duty Holder?
      • Client and Contractors CDM CPD
      • H&S Services
    • The Building Safety Act
      • What is the Building Safety Act?
      • Does the Building Safety Act apply to all buildings?
      • What are the key changes to the Building Safety Act?
      • Changes to the Building Regulations
      • What does the Building Regulations Client have to do?
      • Who is the Accountable Person?
      • How do I prepare for Building Safety Act changes?
    • transport and infrastructure
      • Feasibility and Viability
      • Highway and Access Design
      • Travel Plans
      • Transport planning
  • our sectors
    • Arts and Culture
    • Bluelight
    • Commercial
      • Offices
      • Industrial
      • Retail
      • Telecoms
    • Defence
    • Education
      • Education Services
    • EV Hub Design Services
    • Fuel Filling Stations
    • Health
    • Heritage and Conservation
    • Laboratories
    • Leisure
    • Residential
    • Social and Community
  • our projects
  • news & socials

Ingleton Wood deliver major library refurbishment project at City College Norwich Wednesday, 26th February 2025

Ingleton Wood have be provided multidisciplinary expertise for a significant library refurbishment project on City College Norwich's prestigious campus.

This project aims to enhance the student experience with new multi-faith spaces, wellbeing zones, and improved lecture room facilities; supporting the College's increasing enrolment numbers and fostering an inclusive and supportive environment. 

City College Norwich originally approached Ingleton Wood to deliver this tight turnaround project due to our trusted track record in delivering high-quality, complex projects under challenging timelines.

Ingleton Wood’s multidisciplinary teams delivered a comprehensive range of services for this project, including Interior Design, Architecture, Building Surveying, Mechanical, Electrical, and Public Health (MEP) services, as well as Project Management and Contract Administration.

With an estimated project cost of over £600K, this redevelopment aims to create a more efficient use of internal spaces, delivering enhanced functionality and benefits for both students and staff. 

Overcoming challenges

The project timeline proceeded in two phases: Phase 1 completion by end of Summer 2024 and Phase 2 compled by Winter 2024. Delivering a project of this scope within a short timeframe posed significant challenges, particularly in design, procurement, and site coordination. 

However, thanks to our strong relationship with our contractors and efficient communication with City College Norwich, these challenges were managed effectively.

The Principal Contractor, SMART CIG, also played a crucial role in this project, working closely with Ingleton Wood to ensure that all aspects of the development meet the highest standards and are completed on time.

Ingleton Wood’s commitment to excellence

This project exemplifies Ingleton Wood's commitment to delivering quality design and construction solutions that meet client expectations, even under tight deadlines. 

The transformed space now provides modern, efficient, and inclusive facilities to benefit City College Norwich's students and staff for years to come.

 

XPinterestLinkedInEmailShare with other services

Related Links

Tags

#iwpresents#iwnorwich#iwinteriordesign#iwbuildingsurveying#iwprojectmanagement

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Nottingham0115 8654072
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Email Health and Safety
  • Email Sustainability
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2025 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: The Loom, 14 Gower’s Walk, London, E1 8PY. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please choose whether to approve, customise or reject the site's use of cookies; your choice will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.

You can view our cookie policy at the following page: Cookies Policy.