Ingleton Wood
We are hiring
Home
Jobs
    • About Us
      • Overview
      • Partners
      • Our Senior Team
      • Careers
      • Practice Management
      • Awards
      • Testimonials
    • Our Services
      • Architecture
      • Building Surveying
      • Building Services Engineering
      • Planning
      • Interior Design
      • Sustainability
      • Civil and Structural Engineering
      • Quantity Surveying
      • Project Management
      • CDM and H&S Services
      • Building Information Modelling
    • Our Sectors
      • Commercial
      • Defence
      • Education
      • Fuel Filling Stations
      • Health
      • Heritage and Conservation
      • Leisure
      • Residential
      • Social and Community
    • Our Projects
    • News & Events
      • Latest News
      • Our Blog
    • Contact Us
      • London
      • Billericay
      • Cambridge
      • Colchester
      • Norwich
      • Oxford

< Back to Our Projects

Secondary Entry Point, RAF Mildenhall and LVIS Gate Alconbury, USAF

Secondary Entry Point, RAF Mildenhall and LVIS Gate Alconbury, USAF

Gate 11 is located on the South side of RAF Mildenhall and is a secondary Access Control Point onto the Base Installation and is in close proximity of critical AF assets.  Its current design had numerous limitations and did not comply with ATFP UFC and SDDCTEA requirements. Ingleton Wood were appointed to conduct a review of the existing security requirements and develop a scheme complete with specific speed calculations to comply with US security requirements.

We provided full multi-disciplinary design services to ensure the complex security requirements of the installation entrance were achieved within the confinement of the existing site limitations. This was managed within a secure data environment and all design information was fully coordinated prior to construction.

LVIS Gate at RAF Alconbury included the merger of the main gate and large vehicle inspection area. Ingleton Wood were appointed to provide a compliant scheme within the confines of the available budget.  We provided full multi-disciplinary design services to ensure compliance with ATFP UFC and SDDCTEA requirements.

Related Links

Our Services

ArchitectureConcept and FeasibilityMasterplanningPlanning ApplicationsBuilding Services EngineeringElectrical DesignCivil EngineeringDrainage DesignSustainable Drainage (SuDS)HighwaysEnabling WorksExternal WorksQuantity SurveyingProject ManagementCDM and H&S ServicesH&S Services

Our Sectors

Defence

Our Senior Team

Darren Fowler

Offices

LondonBillericayCambridgeColchesterNorwichOxford

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: 10-12 Alie Street, London, E1 8DE. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please choose whether to approve, customise or reject the site's use of cookies; your choice will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.

You can view our cookie policy at the following page: Cookies Policy.