Ingleton Wood
Our BrochuresContact UsWe are hiring
  • our practice
    • About us
    • Our Mission and Values
    • Our Story
    • Practice Management
    • Our sustainability commitment
    • Frameworks
    • The Armed Forces Covenant
    • Awards
    • Testimonials
    • Brochures
  • Our People
    • overview
    • Equality, Diversity and Inclusion
    • Life at Ingleton Wood
    • Careers
    • Apprenticeships
    • Supporting CPD
    • Benefits
    • How to join our practice
    • Our Partnership
      • John Dixon
      • Stuart Norgett
      • David Cresswell
      • Laura Mansel-Thomas
      • Paul Cavalier
      • Simon Gorst
      • Daniel Legg
      • Anni Folan-White
      • Darren Fowler
    • Our Senior Team
  • our services
    • Architecture
      • Concept and Feasibility
      • Masterplanning
      • Planning Applications
      • Detailed Design
      • Visualisation
    • Building Surveying
      • Drone Services
      • Project Work
      • Expert Witness
      • Surveys
      • Dilapidations
      • Repairs and Maintenance
      • Technical Due Diligence (TDD)
      • Party Wall and Neighbourly Matters
      • Reinstatement Cost Assessments
      • Development Monitoring
      • Cladding
    • Building Services Engineering
      • Mechanical Design
      • Electrical Design
      • Environmental Design
      • Surveys and Asset Registers
      • Management Services
      • Defence and Security
    • Planning
      • Planning Applications and Appeals
      • Planning and Development Appraisals
      • Development Plan Representations
      • Masterplanning
      • Public Consultation
      • Post Planning Services
    • Interior Design
      • Our Service
      • Our Expertise and Adding Value
      • Visualisation
    • Sustainability
      • Climate resilience
      • Sustainability in Planning
      • Regulation Compliance
      • Energy Strategies
      • Passivhaus
      • BREEAM and Code
      • Zero Carbon
      • Post Occupancy Evaluation
      • CPD and Research
      • Health and wellbeing
      • WELL certification
    • Civil Engineering
      • Planning Services
      • Flood Risk Assessment
      • Drainage Design
      • Sustainable Drainage
      • Highways
      • Enabling Works
      • External Works
    • Structural Engineering
      • Structural Design
      • Foundation Design
      • Basement and Retaining Wall Design
      • Timber Metal Frame Design
      • Structural Inspections
    • Quantity Surveying
    • Project Management
    • CDM and H&S Services
      • What is a CDM Advisor?
      • What is a Principal Designer?
      • Our CDM Service
      • What does a Client have to do?
      • Are you a Duty Holder?
      • Client and Contractors CDM CPD
      • H&S Services
    • The Building Safety Act
      • What is the Building Safety Act?
      • Does the Building Safety Act apply to all buildings?
      • What are the key changes to the Building Safety Act?
      • Changes to the Building Regulations
      • What does the Building Regulations Client have to do?
      • Who is the Accountable Person?
      • How do I prepare for Building Safety Act changes?
    • transport and infrastructure
      • Feasibility and Viability
      • Highway and Access Design
      • Travel Plans
      • Transport planning
  • our sectors
    • Arts and Culture
    • Bluelight
    • Commercial
      • Offices
      • Industrial
      • Retail
      • Telecoms
    • Defence
    • Education
    • EV Hub Design Services
    • Fuel Filling Stations
    • Health
    • Heritage and Conservation
    • Laboratories
    • Leisure
    • Residential
    • Social and Community
  • our projects
  • news & socials

< Back to our projects

Installation of Solar Photovoltaic Systems

Installation of Solar Photovoltaic Systems

Ingleton Wood were appointed by Essex County Fire & Rescue Service to manage the design, supply and installation of solar photovoltaic systems on 37 fire stations across their portfolio, with the objective to reduce their burden on purchased electricity and their carbon footprint.

A multi-disciplinary service was provided with input provided by our Building Surveying, Electrical Engineering and Environmental Teams. The feasibility stage of the project included building surveys, structural surveys and the preparation of sun-path diagrams and preliminary designs.

Ingleton Wood managed the procurement process including PQQ and competitive tender based on a performance specification and drawings. Scope of works also included associated building, roof access, electrical, fire alarm and lightning protection works.

The project was delivered over a 5-month period.

The installed system has the potential to produce half a Megawatt of electrical generation and will provide a carbon reduction of over 200 tonnes.

Related Links

Our Services

CDM and H&S Services

our sectors

Bluelight

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Nottingham0115 8654072
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Email Health and Safety
  • Email Sustainability
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: The Loom, 14 Gower’s Walk, London, E1 8PY. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer