Ingleton Wood
COVID-19
Home
Jobs
    • About Us
      • Overview
      • Partners
      • Our Senior Team
      • Careers
      • Practice Management
      • COVID-19
      • Awards
      • Testimonials
    • Our Services
      • Architecture
      • Building Surveying
      • Building Services Engineering
      • Planning
      • Interior Design
      • Sustainability
      • Civil and Structural Engineering
      • Quantity Surveying
      • Project Management
      • CDM and H&S Services
      • Building Information Modelling
    • Our Sectors
      • Commercial
      • Defence
      • Education
      • Fuel Filling Stations
      • Health
      • Heritage and Conservation
      • Leisure
      • Residential
      • Social and Community
    • Our Projects
    • News & Events
      • Latest News
      • Our Blog
    • Contact Us
      • London
      • Billericay
      • Cambridge
      • Colchester
      • Norwich
      • Oxford

< Back to Our Projects

St Thomas More

St Thomas More

Ingleton Wood were approached by St Thomas More High School in Westcliff-on-Sea to assist in obtaining funding from Southend Borough Council for a new classroom block to allow expansion. Our brief was to design a classroom block and prepare a budget estimate on which the funding would be based.

Funding was secured and we were subsequently appointed as Employer’s Agent, Architecture, Structural Engineering, Building Services, Principal Designer and Quantity Surveying Cost Consultantcy to take the scheme from feasibility to completion. This involved preparing the design, managing the tendering process and contract administration.

The building accommodates classrooms, exam/multi-purpose room, offices, media suite, gymnasium/changing rooms, shop, toilets, stores, cleaners’ cupboards and a lift. The development also included the provision of new external tennis courts.

The building uses electrical heating and comfort cooling with mechanical and passive ventilation systems. The electrical power is supplemented by solar PV panels and all systems are control by a building management system.

Related Links

Our Services

ArchitectureConcept and FeasibilityPlanning ApplicationsDetailed DesignVisualisationBuilding SurveyingProject WorkBuilding Services EngineeringMechanical DesignElectrical DesignEnvironmental DesignPlanningPlanning Applications and AppealsSustainabilitySustainability in PlanningRegulation ComplianceEnergy StrategiesCivil and Structural EngineeringCivil EngineeringPlanning ServicesStructural EngineeringFoundation DesignTimber Frame and Cold Formed Metal Frame DesignQuantity SurveyingProject ManagementCDM and H&S Services

Our Sectors

Education

Our Senior Team

Andrew WrightChris Mabbutt

Offices

Billericay

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: 10-12 Alie Street, London, E1 8DE. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please click on the following button; your input will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.