Ingleton Wood
COVID-19
Home
Jobs
    • About Us
      • Overview
      • Partners
      • Our Senior Team
      • Careers
      • Practice Management
      • COVID-19
      • Awards
      • Testimonials
    • Our Services
      • Architecture
      • Building Surveying
      • Building Services Engineering
      • Planning
      • Interior Design
      • Sustainability
      • Civil and Structural Engineering
      • Quantity Surveying
      • Project Management
      • CDM and H&S Services
      • Building Information Modelling
    • Our Sectors
      • Commercial
      • Defence
      • Education
      • Fuel Filling Stations
      • Health
      • Heritage and Conservation
      • Leisure
      • Residential
      • Social and Community
    • Our Projects
    • News & Events
      • Latest News
      • Blog
    • Contact Us
      • London
      • Billericay
      • Cambridge
      • Colchester
      • Norwich
      • Oxford

< Back to Our Projects

The Billiard Factory

The Billiard Factory

Ingleton Wood have assisted the design team to develop a sustainable energy report in line with the London Hierarchy of Lean, Clean and
Green strategies, working with the architect pH+ to develop a low energy strategy incorporating measures including:

  • Building massing which maximises natural daylight and solar passive heating
  • Building fabric and air tightness which outperforms Part L 2013
  • Natural ventilation
  • 100% low energy lighting
  • Low carbon heating and cooling system
  • A small amount of PV

Utilising appropriate use of the facade, efficient heating and cooling systems and the use of LZC technologies appropriate to the site, the proposed building achieves an overall reduction of over 35% against the CO2 emissions compared to a Part L 2013 notional development through this strategy.

Our considerable experience writing energy reports means a fast turnaround as we include our own specialists SBEMs and SAP calculations to ensure the planning conditions are met and the relevant conditions alleviated.

 

 

Related Links

Our Services

Building Services EngineeringEnvironmental DesignSustainabilityEnergy Strategies

Our Sectors

CommercialRetail

Our Senior Team

Robert Diamond

Offices

Colchester

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2020 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: 10-12 Alie Street, London, E1 8DE. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please click on the following button; your input will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.