Ingleton Wood
Our BrochuresContact UsWe are hiring
  • our practice
    • About us
    • Our Mission and Values
    • Our Story
    • Practice Management
    • Our sustainability commitment
    • Frameworks
    • The Armed Forces Covenant
    • Awards
    • Testimonials
    • Brochures
  • Our People
    • overview
    • Equality, Diversity and Inclusion
    • Life at Ingleton Wood
    • Careers
    • Apprenticeships
    • Supporting CPD
    • Benefits
    • How to join our practice
    • Our Partnership
      • John Dixon
      • Stuart Norgett
      • David Cresswell
      • Laura Mansel-Thomas
      • Paul Cavalier
      • Simon Gorst
      • Daniel Legg
      • Darren Fowler
      • Peter Webb
      • Max Chapman
      • Wesley Henderson
    • Our Senior Team
  • our services
    • Architecture
      • Concept and Feasibility
      • Masterplanning
      • Planning Applications
      • Detailed Design
      • Visualisation
    • Building Surveying
      • Drone Services
      • Project Work
      • Expert Witness
      • Surveys
      • Dilapidations
      • Repairs and Maintenance
      • Technical Due Diligence (TDD)
      • Party Wall and Neighbourly Matters
      • Reinstatement Cost Assessments
      • Development Monitoring
      • Cladding
    • Building Services Engineering
      • Mechanical Design
      • Electrical Design
      • Environmental Design
      • Surveys and Asset Registers
      • Management Services
      • Defence and Security
    • Planning
      • Planning Applications and Appeals
      • Planning and Development Appraisals
      • Development Plan Representations
      • Masterplanning
      • Public Consultation
      • Post Planning Services
    • Interior Design
      • Our Service
      • Our Expertise and Adding Value
      • Visualisation
    • Sustainability
      • Climate resilience
      • Sustainability in Planning
      • Regulation Compliance
      • Energy Strategies
      • Passivhaus
      • BREEAM and Code
      • Zero Carbon
      • Post Occupancy Evaluation
      • CPD and Research
      • Health and wellbeing
      • WELL certification
    • Civil Engineering
      • Planning Services
      • Flood Risk Assessment
      • Drainage Design
      • Sustainable Drainage
      • Highways
      • Enabling Works
      • External Works
    • Structural Engineering
      • Structural Design
      • Foundation Design
      • Basement and Retaining Wall Design
      • Timber Metal Frame Design
      • Structural Inspections
    • Quantity Surveying
    • Project Management
    • CDM and H&S Services
      • What is a CDM Advisor?
      • What is a Principal Designer?
      • Our CDM Service
      • What does a Client have to do?
      • Are you a Duty Holder?
      • Client and Contractors CDM CPD
      • H&S Services
    • The Building Safety Act
      • What is the Building Safety Act?
      • Does the Building Safety Act apply to all buildings?
      • What are the key changes to the Building Safety Act?
      • Changes to the Building Regulations
      • What does the Building Regulations Client have to do?
      • Who is the Accountable Person?
      • How do I prepare for Building Safety Act changes?
    • transport and infrastructure
      • Feasibility and Viability
      • Highway and Access Design
      • Travel Plans
      • Transport planning
  • our sectors
    • Arts and Culture
    • Bluelight
    • Commercial
      • Offices
      • Industrial
      • Retail
      • Telecoms
    • Defence
    • Education
      • Education Services
    • EV Hub Design Services
    • Fuel Filling Stations
    • Health
    • Heritage and Conservation
    • Laboratories
    • Leisure
    • Residential
    • Social and Community
  • our projects
  • news & socials

Work starts on £1.5 million Thorney Bay Pavilion in Canvey Island, Essex Friday, 15th March 2024

Spades struck the ground for the first time as Ingleton Wood joined local councillors to welcome the start of work to build a new £1.5 million pavilion at Thorney Bay in Canvey Island, Essex.

The project will see the construction of a new build pavilion, associated external works, and car park extension improvements. The project forms part of the regeneration programme for Canvey Island’s seafront by providing improvements to the facilities and visitor experience.

Our Practice is providing full planning, design, project management, and contract administration services from inception to completion for the regeneration scheme.

Our Colchester office also worked with Castle Point Borough Council to secure £1.52 million in funding from the Coastal Communities Fund (CCF) for the project.

Andrew Marchant, Senior Associate and Building Surveyor, said: “Through our sustainable designs and innovative measures, we are not only helping to regenerate the cherished seafront at Thorney Bay, but also to create a modern, vibrant and inclusive space for long-term benefit and enjoyment.

“After working closely with the Council to secure the £1.52m Coastal Community Funding, we are thrilled work has started and look forward to supporting the delivery of the works through to completion. We hope the regeneration project serves as inspiration for further sustainable development and environmental conservation across the region.”

Construction is due to complete in early December 2024 with formal handover of the new facilities scheduled for early January 2025.

Local dignitaries including the Mayor of Castle Point Borough Council, Lynsey McCarthy-Calvert, and members of the Canvey Bay Watch group gathered alongside Ingleton Wood for the launch event on March 14th.

Cllr Dave Blackwell, Leader of Castle Point Borough Council, who also attended, said: “Thorney Bay is an important area of Canvey Island that many residents enjoy. The construction of a new Pavilion and cafe will serve the Borough well and should entice more people to come to enjoy our beaches each year.”

The construction phase will begin with work on the car park extension, as well as excavating and preparation of the site for the installation of the piling mat, used as part of the deep piling to secure the new pavilion.

Thorney Bay

XPinterestLinkedInEmailShare with other services

Related Links

Tags

#iwprojects#iwcolchester#thorneybay#canveyisland#regeneration#newbuild#pavilion#iwplanningconsultancy#iwbuildingsurveying#iwprojectmanagement

Contact Us

MapLondonTelephone020 7680 4400
Billericay01277 637800
Cambridge01223 202040
Colchester01206 224270
Norwich01603 666847
Nottingham0115 8654072
Oxford01865 411475
  • Email General Enquiries
  • Email Business Development
  • Email Recruitment / HR
  • Email Health and Safety
  • Email Sustainability
  • Twitter Twitter
  • LinkedIn LinkedIn
  • Instagram Instagram

Ingleton Wood © 2025 | Ingleton Wood LLP is a Limited Liability Partnership registered in England and Wales with No. OC306572, registered address: The Loom, 14 Gower’s Walk, London, E1 8PY. VAT No. 262 7242 10 |

Sitemap | Cookies Policy | Privacy Notice | Disclaimer

This website uses cookies; some may have already been set.

To remove this message, please choose whether to approve, customise or reject the site's use of cookies; your choice will be saved in a cookie. If you would prefer the site to not use cookies at all then please block or otherwise disable cookies in your web browser, though you may find that this prevents certain parts of the site from working correctly.

You can view our cookie policy at the following page: Cookies Policy.